PASSER LARS
  • The Team
  • QHSE
  • News
  • Projects
  • Careers
  • Contact
  • Get in Touch: info@passer-lars.com

PASSER LARS

  • Equipment Rental
  • Engineering & Project Management
  • Cable Handling and Storage Services
  • New Build Equipment
  • Personnel
  • Yard & Quayside
Monday, 07 December 2020 / Published in News

PASSER LARS 2000Te Carousel en-route to China for Aker Solutions Lingshui Umbilicals Installation

PASSER LARS have successfully mobilised a 2000Te installation carousel spread for Aker Solutions. The equipment is currently under transit to Shenzen, China, ahead of infield installation operations of static and dynamic umbilicals for the CNOOC Lingshui Project, whereby Aker Solutions hold the EPC Contract for the umbilical products.

.

Responsible for the mobilisation, transportation, installation vessel equipment integration, and equipment technicians in field, PASSER LARS executed a rapid turnaround operation to prepare the equipment for departure from The Netherlands within a two week period from contract award. Project specific modifications to the carousel were required, with all engineering and project management performed in house.
 
In addition to the equipment supply, PASSER LARS have been awarded a separate contract from Aker Solutions to provide a full personnel team and project engineering support for transpooling operations of the umbilicals from transport to installation vessel, in Shenzen, China. 
 
This project marks the first instance of PASSER LARS delivering installation equipment and personnel to the Far East Region, and upon completion of this project there is potential the carousel can remain in region to support clients on other Oil & Gas and Offshore Wind prospects.

 

What you can read next

PASSER LARS Awarded Full Carousel Rental Spread with TechnipFMC
1000Te Modular Onshore and Offshore Carousel System added to PASSER LARS Equipment Fleet
PASSER LARS Completes Umbilical Spooling Operations for Aker Solutions Lingshui Project

Search

Recent Posts

  • Project Engineer

  • Swan Hunter joins forces with PASSER Group to create a leading cable handling and logistics group

  • PASSER LARS Engineering Assistance for Oceanteam Solutions

  • PASSER LARS Awarded Full Carousel Rental Spread with TechnipFMC

  • PASSER LARS Completes Umbilical Spooling Operations for Aker Solutions Lingshui Project

  • PASSER LARS 2000Te Carousel Operational for Global Marine Group

  • PASSER LARS provides Project Management, Design Engineering, and Mobilisation Support for Cable Transportation and Storage Barge

  • PASSER LARS completes mobilisation of 4000Te Carousel onto Normand Clipper CSV for Global Marine Group

  • PASSER LARS completes Modular Offshore Grid Cable Storage Load-in

  • 1000Te Modular Onshore and Offshore Carousel System added to PASSER LARS Equipment Fleet

Explore

  • Equipment Rental
  • Engineering & Project Management
  • Cable Handling and Storage Services
  • New Build Equipment
  • Personnel
  • Yard & Quayside

Follow Us

  • Linkedin

Legal

  • Privacy policy
  • Cookie policy
2022 All Rights Reserved ©
TOP