TECHNIPFMC LIZA 2
EQUIPMENT, ENGINEERING & INSTALLATION
EQUIPMENT, ENGINEERING & INSTALLATION
CLIENT TECHNIPFMC
VESSEL HAPPY RIVER HLV
PASSER-LARS were awarded a fast-track equipment rental project with TechnipFMC for a full carousel equipment spread for transportation of umbilicals for the Exxon Mobil Liza 2 Project.
PASSER-LARS were fully responsible for the execution of the mobilisation of equipment onto the HLV in Skien, Norway, and also for provision of equipment operating technicians for transpooling operations in Newcastle, UK, and Pascagoula, USA.
The late contract award called for efficient engineering and project management to modify the carousel, loading tower, and tensioner, to meet the specifications of the umbilical product. In addition PASSER-LARS were awarded several variation order work packages, including design and installation of a detailed load spreading solution to transfer carousel and umbilical loads into several of the HLV cargo hatches during transatlantic crossing.
© 2023 PASSER LARS BV. All rights reserved | Privacy Policy